| Rigid Transmission Line Services | ||||
| Part Number | Description | Unit Price | Product Code | Last revised |
| LAY-003 | ERI WIDELine MACXLine Transmission Line System design with installation drawings and complete Bill of Materials. Includes the following: | $10,000.00 | VSER | 6/1/2005 |
| Engineering system design of broadband transmission line system that will deliver a system VSWR of better the 1.08:1 for NTSC channels 14 to 56. | ||||
| Marking and tagging of individual system components and detailed installation instructions. | ||||
| System layout service, after receipt of tower and building drawings, Electronics Research, Inc. will provide: | ||||
| Preliminary System Layout — (10-12 Weeks Before Delivery) | ||||
| Basic AutoCAD System Layout identifying Transmission Line routing and Preliminary Bill Of Materials (PBOM) submitted for customer approval | ||||
| Final Detailed System Layout (4-6 weeks Before Delivers,) | ||||
| Detailed Final AutoCAD System Layout with Final BOM (Changes to this final BOM may accrue additional charges; Material and Labor, and potentially impact date of delivery) | ||||
| Comprehensive Installation Manual (At time of Delivery) | ||||
| Four Copies, with Material Shipment. | ||||
| Manual includes: | ||||
| •Detailed Final System Layout Drawings And BOM | ||||
| •Recommended Installation Practices | ||||
| •Product Installation Bulletins | ||||
| •Storage Information | ||||
| •Product Maintenance | ||||
| Customer requested modifications to the Final System Layout and Final BOM may incur additional material and labor costs and will be billed at prevailing rates. | ||||
| Timely submission of customer tower or other installation data is required to keep the project on schedule. Tower/installation information is need at least 8-10 weeks in advance of delivery. The customer will be informally and, if necessary, formally info | ||||
| LAY-001 | ERI Transmission Line System simple design with installation drawings and complete Bill of Materials. Includes the following: | $5,000.00 | VSER | 6/1/2005 |
| With each system layout service, after receipt of tower and building drawings, Electronics Research, Inc. will provide: | ||||
| Preliminary System Layout — (10-12 Weeks Before Delivery) | ||||
| Basic AutoCAD System Layout identifying Transmission Line routing and Preliminary Bill Of Materials (PBOM) submitted for customer approval | ||||
| Final Detailed System Layout (4-6 weeks Before Delivers,) | ||||
| Detailed Final AutoCAD System Layout with Final BOM (Changes to this final BOM may accrue additional charges; Material and Labor, and potentially impact date of delivery) | ||||
| Comprehensive Installation Manual (At time of Delivery) | ||||
| Four Copies, with Material Shipment. | ||||
| Manual includes: | ||||
| •Detailed Final System Layout Drawings And BOM | ||||
| •Recommended Installation Practices | ||||
| •Product Installation Bulletins | ||||
| •Storage Information | ||||
| •Product Maintenance | ||||
| Customer requested modifications to the Final System Layout and Final BOM may incur additional material and labor costs and will be billed at prevailing rates. | ||||
| Timely submission of customer tower or other installation data is required to keep the project on schedule. Tower/installation information is need at least 8-10 weeks in advance of delivery. The customer will be informally and, if necessary, formally informed of delays due to lack of information. | ||||
| LAY-002 | ERI Transmission Line System complex design with installation drawings and complete Bill of Materials. Includes the following: | $7,500.00 | VSER | 6/1/2005 |
| With each system layout service, after receipt of tower and building drawings, Electronics Research, Inc. will provide: | ||||
| Preliminary System Layout — (10-12 Weeks Before Delivery) | ||||
| Basic AutoCAD System Layout identifying Transmission Line routing and Preliminary Bill Of Materials (PBOM) submitted for customer approval | ||||
| Final Detailed System Layout (4-6 weeks Before Delivers,) | ||||
| Detailed Final AutoCAD System Layout with Final BOM (Changes to this final BOM may accrue additional charges; Material and Labor, and potentially impact date of delivery) | ||||
| Comprehensive Installation Manual (At time of Delivery) | ||||
| Four Copies, with Material Shipment. | ||||
| Manual includes: | ||||
| •Detailed Final System Layout Drawings And BOM | ||||
| •Recommended Installation Practices | ||||
| •Product Installation Bulletins | ||||
| •Storage Information | ||||
| •Product Maintenance | ||||
| Customer requested modifications to the Final System Layout and Final BOM may incur additional material and labor costs and will be billed at prevailing rates. | ||||
| Timely submission of customer tower or other installation data is required to keep the project on schedule. Tower/installation information is need at least 8-10 weeks in advance of delivery. The customer will be informally and, if necessary, formally informed of delays due to lack of information. | ||||
| TST-001 | 6.0MHz VSWR Sweep of the operating channel(s), wide band frequency and time domain sweeps, and tuning supervision. This service is performed after the installation of the transmission line and antenna has been completed. | $5,000.00 | VSFR | 6/1/2005 |
| NOTES: | ||||
| ERI field service price includes a single mobilization and three (3) days travel and on site, for one person. Additional days if required will be charged for at the rate of $1,200.00 per day, plus expenses billed at cost plus a 15% administration fee. | ||||
| Field service prices are net to ERI and not discountable. | ||||
| Customer to provide tower crew for antenna field matching. | ||||